Order-based neighborhoods for project scheduling with nonregular objective functions
Article Abstract:
Resource-constrained project scheduling problem with general temporal constraints and various types of nonregular objective functions is presented. This is concerned with project scheduling where scarce resources are taken onto account and some nonregular objective is to be minimized.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2003
User Contributions:
Comment about this article or add new information about this topic:
A branch-and bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
Article Abstract:
Exact procedure for general resource-constrained project scheduling problem, where multiple modes are available for the performance of individual activities, with minimum and maximum time lags between different activities, is given.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2003
User Contributions:
Comment about this article or add new information about this topic:
On linear lower bounds for the resonance constrained project scheduling problem
Article Abstract:
The efficient methods for solving the resource constrained project scheduling problem are proposed. This method is based on makespan lower bounds, which linearly depend on the processing times of the activities.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2003
User Contributions:
Comment about this article or add new information about this topic: