Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
Article Abstract:
Research is presented concerning the use of a simulated annealing algorithm as a means of resolving scheduling problems occurring in the multipurpose batch processing plant owned by a pharmaceutical company.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2000
User Contributions:
Comment about this article or add new information about this topic:
Scheduling with target start times
Article Abstract:
The single machine problem of scheduling n independent jobs with target start times, is addressed.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
User Contributions:
Comment about this article or add new information about this topic:
Local search algorithms for the multiprocessor flow shop scheduling problem
Article Abstract:
Research is presented concerning the review and adaptation of job shop and flow shop local search methods for use in solving a scheduling problem in a multiprocessor flow shop. Simulated annealing and variable-depth search are discussed.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Scheduling about a common due date with job dependent asymmetric earliness and tardiness penalties. A genetic algorithm for scheduling staff of mixed skills under multi-criteria
- Abstracts: Club Med takes a return route into the red; horizon is bleak. Club Med shares drop after release of profit warning
- Abstracts: Deutsche Telekom, Cable & Wireless see shares soar on report of deal. France Telecom Sells Stake In German Rival for C3.1 Billion
- Abstracts: Solving an assignment-selection problem with verbal information and using genetic algorithms. Economic expectations, fuzzy sets and financial planning
- Abstracts: The multi-mode resource-constrained project scheduling problem with generalized precedence relations. An effective implementation of the Lin-Kernighan traveling salesman heuristic