Rotation cycle schedulings for multi-item production systems
Article Abstract:
Multi-item production systems are considered in the context of rotation cycle schedulings, converted into a generalized travelling salesman problem.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
User Contributions:
Comment about this article or add new information about this topic:
A dynamic analysis of the single-item periodic stochastic inventory system with order capacity
Article Abstract:
A dynamic programming methodology to examine inventory control problems is presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2003
User Contributions:
Comment about this article or add new information about this topic:
Single item lot-sizing problems with backlogging on a single machine at a finite production rate
Article Abstract:
A production schedule for a single machine used to manufacture a single item is presented. The lot-sizing problems and backlogging in the schedule based on a finite production rate are discussed.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A memetic algorithm for the total tardiness single machine scheduling problem. Algorithmic approach to the satisfactory graph partitioning problem
- Abstracts: Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan. A tabu search method guided by shifting bottleneck for the job shop scheduling problem
- Abstracts: Eni's operating profit grows 5.7% as costs fall and production swells. Yukos's net profit fall slightly below analysts' forecasts
- Abstracts: Credit Suisse beats '98 estimates, posting $2.1 billion in net profit. Sampo reports 21% decline in 1st half operating profit
- Abstracts: Optimal system design with MC2 linear programming: a dual contingency plan approach. Multicriteria hub decision making for rural area telecommunication networks