Managing change: a guide for chemical engineers
Article Abstract:
The successful implementation of the Project Application Leveraging and Data Integration Program was aimed at enhancing the pilot company's return-on-net assets. Using 3D CAD, construction rework was reduced to 1.5% of total installed cost (TIC). Total TIC reductions of 25-30% on all projects were effected after the system introduction of a document- management. Project completion was also coducted at a rate which was 25% faster than the old baseline.
Publication Name: Chemical Engineering
Subject: Engineering and manufacturing industries
ISSN: 0009-2460
Year: 2000
User Contributions:
Comment about this article or add new information about this topic:
Carry a gas detector with you to feel really safe
Article Abstract:
The GasAlertClip gas detectors from BW Technology are designed for long life with no maintenance required. The gas detectors are offered in the H2S, CO and O2 versions, which can be clipped to the lapel, pocket, belt or hard hat for portable warning of hazardous conditions. The H2S model senses from 0 to 100 ppm from -40 to +45 C; the CO model from 0 to 300 ppm between -30 to +45 C; and the O2 model from O to 30% at -20 to +45 C.
Publication Name: Chemical Engineering
Subject: Engineering and manufacturing industries
ISSN: 0009-2460
Year: 2000
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: From jogging to walking - a rundown. Academics say engineers and health professionals should collaborate. Sample of feedback report key themes
- Abstracts: Earth and sea become first Landmark winners. Wired up to waste. Weight-based landfill tax welcomed, but not trusts
- Abstracts: What Picturephone teaches about forecasting. Scientists, engineers - shortage or surplus? Customization promises sharp competitive edge
- Abstracts: It's all about improving performance: teams work better with expanded problem solving and decision making skills
- Abstracts: Selecting and using chelating agents. Selecting low-flow pumps. Selecting secondary containment piping