Scheduling in an automated flow shop to minimize cost: backward-meta scheduling method
Article Abstract:
An automated flow shop model for computer integrated manufacturing has been developed based on the concept of near-optimal meta scheduling technique. The model provides several scheduling methods and evaluates them through simulation tests to determine those that permit cost-effective and optimal scheduling operations. It has been determined that one of the proposed methods can be adopted for systems in which calculation time is strictly constrained. Moreover, the model was used to prove the Just In Time production system theory through the use of backward scheduling and by showing that the model can actually reduce the quantity of inventories.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1997
User Contributions:
Comment about this article or add new information about this topic:
An analytical comparison of inventory costs between the pull and the parts-oriented production systems
Article Abstract:
The pull, or Toyota, production system requires subsequent work stations to withdraw needed materials in the needed quantities at the necessary time from a stock point in the immediately preceding station. In the case of the parts-oriented system, the necessary products are stored long before they are needed for production purposes. Under larger variations in parts demand, larger production stages and higher safety stock level, the parts-oriented system requires less inventory costs. However, as variation in parts demand and safety stock level decreases, the pull system generates more inventory cost savings.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1996
User Contributions:
Comment about this article or add new information about this topic:
Sequencing method for products in consideration of assembly time
Article Abstract:
A novel sequencing method based on an objective function is proposed for mixed-model assembly scheduling environments with a single workstation. The proposed algorithm extends the time-based goal chasing method and utilizes some heuristic techniques to minimize the objective function. Numerical results show the effectiveness of allocating jobs backward and forward with the small order of the sum of the second power of the increase in area per unit time.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1999
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Putting the automated factory together. Planning for automatic assembly. Evolution in machines and systems
- Abstracts: Friction makes fast moves to low cost. Continuous fibres lead to successful filter. CV joint made with muscle
- Abstracts: Complying with anti-terrorism standards. Strengthening the chemical enterprise
- Abstracts: Flying in formation ... new document defines aerospace supplier quality. PDM software: what's in it for quality pros?
- Abstracts: A new concept of job shop scheduling system - hierarchical decision model. Simulated annealing approach for minimizing the makespan of the general job-shop