Using aggregation to optimize long-term production planning at an underground mine
Article Abstract:
Usage of heuristic integer programming algorithms, for development of production scheduling applications in mining and metals industries, is described.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
User Contributions:
Comment about this article or add new information about this topic:
Applying machine based decomposition in 2-machine flow shops
Article Abstract:
A machine based decomposition techniques, which can solve rescheduling problem in 2-machine flow shops, is presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A graph based model for survivability applications. A response to comments on modeling undesirable factors in efficiency evaluation
- Abstracts: Three-stage flow-shop scheduling with assembly operations to minimize weighted sum of product completion times
- Abstracts: Heuristic for unrelated machine scheduling with precedence constraints. Insertion of a random task in a schedule: a real time approach
- Abstracts: Second order symmetric duality in non-differentiable multiobjective programming with F-convexity
- Abstracts: Comments on: a comparative analysis for determining optimal price order quantity when a sale increases demand