Connectedness of efficient solutions in multiple criteria combinatorial optimization
Article Abstract:
The topological connectedness of the set of efficient solutions to multiple criteria optimization problems defined using a linear programming formulation was investigated. Specifically, computational experiments were carried out to show an exemption to the connectedness of efficient solutions to the shortest path problem and to prove the non-connectedness of the spanning tree problem.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1997
User Contributions:
Comment about this article or add new information about this topic:
The biobjective undirected two-commodity minimum cost flow problem
Article Abstract:
The simultaneous shipment of several commodities from the origin to a destination of a network leads to multi-commodity flow problems. The change of variable approach is proposed to solve the biobjective two-commodity cost flow problem.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
User Contributions:
Comment about this article or add new information about this topic:
Solving biobjective combinatorial max-ordering problems by ranking methods and a two-phase approach
Article Abstract:
K-best algorithms are constructed using a two-phase method and ranking algorithms to biobjective combinatorial max-ordering problems.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2003
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Dynamic parametric bounds on efficient outcomes in interactive multiple criteria decision making problems. Decision making with the AHP: why is the principal eigenvector necessary
- Abstracts: CO2 emissions trading planning in combined heat and power production via multi-period stochastic optimization
- Abstracts: One-dimensional machine location problems in a multi-product flowline with equidistant locations. The effect of material flow and workload on the performance of machine location heuristics
- Abstracts: Scheduling uncertain orders in the customer-subcontractor context. A fuzzy genetic algorithm for driver scheduling
- Abstracts: Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime