Finite-capacity scheduling-based planning for revenue-based capacity management
Article Abstract:
The MinFragCost heuristic was developed for the finite-capacity scheduling-based planning of revenue-based capacity management. Finite capacity scheduling-based production planning based on the MinFragCost provided the best total present value criterion compared to other heuristics such as BackwardInsert and ForwardInsert. However, the performance of the BackwardInsert heuristic was improved when coupled with compaction.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1997
User Contributions:
Comment about this article or add new information about this topic:
Optimal product design using a colony of virtual ants
Article Abstract:
A method for selecting the best product design, using the ant colony optimization strategy, is presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A new approach for solving repair limit problems. Data set generation for rectangular placement problems
- Abstracts: Optimization of a large-scale scallop hanging culture operation. Interactive policy-making - a model of management for public works
- Abstracts: Sensitivity calculation and the throughput of an FMS with respect to the routing mix using perturbation analysis
- Abstracts: Pictures from an exhibition: images of OR MS. A taxing problem: the complementary use of hard and soft OR in the public sector