An impulse control problem of a production model with interruptions to follow stochastic demand
Article Abstract:
Research is presented concerning the investigation of a class of piecewise deterministic Markov process to determine the nature of the stochastic optimal intervention problem. The operational costs are discussed.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
User Contributions:
Comment about this article or add new information about this topic:
On a finite horizon production lot size inventory model for deteriorating items: an optimal solution
Article Abstract:
Research is presented concerning the development of a generalized production lot size inventory model which can be applied to deteriorating items over a finite period of time. Total system costs are discussed.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
User Contributions:
Comment about this article or add new information about this topic:
Class dependent departure process from multiclass phase queues: exact and approximate analyses
Article Abstract:
A strategy was undertaken to determine the features of the class dependent process from a single server phase type queue. The strategy showed that identification of the precise distribution of flow times for every customer class is possible provided that service times and the interval times are phase distributed. It also showed the possibility of identifying the Laplace-Stieltjes transform of the stationery inter-departure times whenever a class arrival process is a Poisson process.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1998
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Estimating customer service in a two-location continuous review inventory model with emergency transshipments
- Abstracts: Cathay Pacific says net profit rose 4.4% in 1994 amid rising costs, competition. Ousters at China Airlines surprise analysts
- Abstracts: Formulation of confidence intervals for estimated actual distances. On the directional bias of the lbp-norm
- Abstracts: A note on the paper "Resource-constrained project scheduling: notation, classification, models and methods" by Brucker et al
- Abstracts: A stochastic dynamic programming model for scheduling of offshore petroleum fields with resource uncertainty. Progressive hedging as a meta-heuristic applied to stochastic lot-sizing