On the fallacy of averages in project risk management
Article Abstract:
A study on the issue of uncertainty relating to average estimates of resources, cost, and time factors in project risk management is presented. Findings demonstrate the inherent problems of using average estimates in preparing for uncertainty.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
User Contributions:
Comment about this article or add new information about this topic:
Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
Article Abstract:
A study uses branch-and-bound method to examine scheduling problems in a multi-mode resource constrained project.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
User Contributions:
Comment about this article or add new information about this topic:
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
Article Abstract:
A study on project scheduling, using heuristics, with relation to moving resource strength is presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment
- Abstracts: A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times
- Abstracts: Consensus reaching in committees. Using MACBETH to determine utilities of governments to parties in coalition formation
- Abstracts: An axiomatic approach to noncompensatory sorting methods in MCDM, I: the case of two categories. An axiomatic characterization of different majority concepts