The joint replenishment problem with variable production costs
Article Abstract:
A study uses a concave-convex programming to solve the joint replenishment problem in inventory management. Production cost is taken into consideration in inventory control.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
User Contributions:
Comment about this article or add new information about this topic:
A deterministic inventory/ production model with general inventory cost rate function and piecewise linear concave production costs
Article Abstract:
A study is conducted to develop an approximation scheme, which can minimize general inventory costs and resolve problems in traditional economic production model.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
User Contributions:
Comment about this article or add new information about this topic:
Equilibrium constrained optimization problems
Article Abstract:
A study is conducted using finite programming methods to analyze the mathematical problems with equilibrium constraints.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: An optimal solution technique for the joint replenishment problem with storage and transport capacities and budget constraints
- Abstracts: Using virtual sample generation to build up management knowledge in the early manufacturing stages. Optimal dynamic assignment of a flexible worker on an open production line with specialists
- Abstracts: Efficient solutions to the cell-formation problem with multiple routings via a double-loop genetic algorithm. Ensuring population diversity in genetic algorithms: a technical note with application to the cell formation problem
- Abstracts: The value of combining forecasts in inventory management - a case study in banking. Multi-item spare parts systems with lateral transshipments and waiting time constraints
- Abstracts: An interactive reservoir management system for Lake Kariba. An optimal timing model of water reallocation and reservoir construction