V-shape property for job sequences that minimize the expected completion time variance
Article Abstract:
A new sufficient condition for an optimal sequence to be V-shaped in job sequences where the expected variance of job completion times is to be minimized has been derived. The condition is satisfied by several problem instances, including those where processing times follow varying distribution patterns. The optimal sequence is V-shaped in terms of mean processing times when the number of jobs is greater than or equal to three.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1996
User Contributions:
Comment about this article or add new information about this topic:
Minimization of agreeably weighted variance in single machine systems
Article Abstract:
The variance minimization problem in the presence of job-dependent weights is analyzed. It is shown that the optimal sequence to the problem is V-shaped in terms of weighted processing time when the problem is weighted in an agreeable manner. However, the job-dependent nature of the weights makes it difficult to answer many issues through the generalization of the known results for the equal weight problem.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1995
User Contributions:
Comment about this article or add new information about this topic:
Time-varying minimum cost flow problems
Article Abstract:
A minimum cost flow problem is studied on a time-varying network, with the objective of determining an optimal schedule to send a flow at minimum cost, from the origin to the destination.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Scheduling to minimize the total resource consumption with a constraint on the sum of completion times. A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- Abstracts: A contract on schools. Fail the test, miss the grade. Stand in line
- Abstracts: Spice up your services. Link in the golden chain. The Asians are coming, again
- Abstracts: Adjudication survives its first legal challenge. Don't count your legal chickens until the law lets them hatch
- Abstracts: Crown Cork & Seal sees lower quarterly profit. Rheinmetall issue surpasses bond-market expectations. Rubbermaid's net dropped 50%