A parallel genetic-neuro scheduler for job-shop scheduling systems
Article Abstract:
Four main problems need to be addressed with regards to schedule generation in shop floor environments. First, job shop scheduling is classified as an NP-hard problem. Second, scheduling is a problem that is different from shop to shop. Third, other decisions which are not isolated from other functions have an influence on scheduling decisions. Fourth, multiple schedule objectives are usually common in scheduling problems before they can be optimized.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1997
User Contributions:
Comment about this article or add new information about this topic:
Genetic neuro-scheduler: a new approach for job shop scheduling
Article Abstract:
Genetic algorithm (GA) and artificial neural networks (ANN) are integrated in the development of a job shop scheduling model. GA is used as an effective search method through gene strings that represent alternative feasible schedules, while ANN provides multiobjective schedule evaluation. The model was better than heuristic algorithms in developing robust and effective results for scheduling problems.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1995
User Contributions:
Comment about this article or add new information about this topic:
The "Orchard" scheduler for manufacturing systems
Article Abstract:
A study was conducted to evaluate a heuristic algorithm for scheduling management in manufacturing systems. The algorithm, called 'Orchard,' is assigned the task of scheduling job loading and is designed for specific printed circuit board lines. Results show that the Orchard is flexible enough to be applied to other manufacturing systems which allow operations using multiple machines.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1992
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Parallelization of an event driven simulator for computer systems simulation. Solartron Introduces New Marine Radar Simulator
- Abstracts: Replacement analysis for components on large scale production systems. Scrap minimization in production processes with stochastic outputs
- Abstracts: Waveform analyzers: making an educated choice. Microwave system tests solids. Customers have the ears of Keithley's Engineers
- Abstracts: Incentives for overhead cost reduction: setup time and lot size considerations. Engineering changes and time delays: a field investigation
- Abstracts: Optimal flow control of flexible manufacturing systems: setup localization by an iterative procedure. Competitive incentives for manufacturing flexibility