A scheduling policy for adjusting economic lot quantities to a feasible solution
Article Abstract:
Solutions for economic lot size problems in a single-machine production facility, using heuristic scheduling policy, are presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
User Contributions:


Comment about this article or add new information about this topic:
A survey of the machine interference problem
Article Abstract:
A study on machine repairman problem with relation to machine maintenance is presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A fast tabu search algorithm for the permutation flow-shop problem
- Abstracts: A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
- Abstracts: A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem. part 2
- Abstracts: SARPlan: a decision support system for Canadian search and rescue operations. Bi-criteria scheduling problems: number of tardy jobs and maximum weighted tardiness