An intelligent system for US Coast Guard cutter scheduling
Article Abstract:
An intelligent scheduling software package that provides a one-year daily schedule for the US Coast Guard's fleet of cutter vessels has been built based on decision theory, knowledge bases and database design. The Cutter Scheduling Assistant Program, which consists of an automatic schedule generator and a discrete optimization system, has been in use since Dec. 1990 and integrated into a database information support system.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1995
User Contributions:
Comment about this article or add new information about this topic:
Modelling and analysis of multistage stochastic programming problems: a software environment
Article Abstract:
The development of an integrated software environment for modelling and analyzing multi-period stochastic programming problems becomes problematic due to the 'dimensionality' and 'representational' aspects of the sample data. The problem is compounded by the need to present the software as an easy-to-use and easy-to-interpret type of product that will respond to different problem environments.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1997
User Contributions:
Comment about this article or add new information about this topic:
A co-operative parallel heuristic for mixed zero-one linear programming: combining simulated annealing with branch and bound
Article Abstract:
The investigation of an exact approach of branch and bound and simulated annealing meta-heuristic for solving integer programming models is presented.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A partial view of OR in Switzerland. Constructing a course schedule by solving a series of assignment type problems
- Abstracts: A preemptive priority queue with balking. Waiting time analysis of the multiple priority dual queue with a preemptive priority service discipline
- Abstracts: Activity consolidation to improve responsiveness. Optimal policies for the sizing and timing of software maintenance projects
- Abstracts: Three-stage flow-shop scheduling with assembly operations to minimize weighted sum of product completion times
- Abstracts: A branch-and-bound algorithm for the mini-max spanning forest problem. An improved algorithm to determine lower bounds for fixed spectrum frequency assignment problem