Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
Article Abstract:
Genetic algorithm (GA) approach works effectively and efficiently in solving the problem of earliness and tardiness production scheduling and planning (ETSP). It is capable of finding solutions to difficult and non-linear function of the measure performance. The approach, which utilizes lot-size consideration and capacity balancing issues, also works well on severe ETPSP problem with various product types. It does not need any unjustifiable perceptions on the objective functions, such as linearity, convexity and differentiability.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1998
User Contributions:
Comment about this article or add new information about this topic:
Application of calculus of variations to a continuous time aggregate production model
Article Abstract:
Initial studies on the production problem of balancing inventory and production costs in continuous-time frame assumed linear inventory holding costs and a proportional relationship between costs and rates of production. A model extends the analysis to include the effects of discrete time variables in overtime and hiring-firing costs with calculus of variations. An optimal trajectory was generated that defined combinations corresponding to Kuhn-Tucker conditions.
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1995
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: A mathematical programming approach towards optimized master production scheduling. A production scheduling system in a hybrid flow shop
- Abstracts: Quality approach supports engineering education reform. Saving the Internet survivors
- Abstracts: Optimal two-stage lot sizing and inventory batching policies. Single facility, multi-item lot sizing under just-in-time and "cyclic scheduling for improvement." (Mathematical Modelling of Inventories)
- Abstracts: Incentives for overhead cost reduction: setup time and lot size considerations. Engineering changes and time delays: a field investigation
- Abstracts: Effects of rejects on in-process inventories in serial production lines. EOQ type formulations for controlling repairable inventories