Semmering: Aus f r den Bahntunnel?
Article Abstract:
An expert committee consisting of experts of the Austrian transport ministry, a Swiss railway expert and representatives of five Austrian states has drawn up a study of the options of improving the country's railway network. It estimates the costs of building the controversial Semmering rail tunnel at more than Sch 10bn. Another Sch 9bn would have to be invested in other sections of the so-called Southern line in order to prevent bottlenecks. The study concludes that the capacity of the existing Semmering line will be sufficient until 2015 even without building the proposed tunnel. If the Aspang line is electrified, the tunnel would not be needed for freight traffic before year 2025. However, the experts point out that the full-scale expansion of the existing Semmering line
Comment:
Austria: Expert committee draws up study of options of improving country's railway network
Publication Name: Presse
Subject: Business, international
ISSN:
Year: 1998
User Contributions:
Comment about this article or add new information about this topic:
AUSTRIA: OBB STOPS TRAINS AT YEAR-END
Article Abstract:
Osterreichische Bundesbahnen
Publication Name: Presse
Subject: Business, international
ISSN:
Year: 1999
User Contributions:
Comment about this article or add new information about this topic:
- Abstracts: Eigenes Handy f r Kinder AUSTRIA: NAVISION BEATS SAP. Endlich verbunden: Connect geht ans Netz
- Abstracts: Handy-Boom bringt in sterreich f nf Milliarden AUSTRIA: INTERNET SHOPPING WITH MAX.MOBIL
- Abstracts: Adjudications internationales/ ANDORRA: PASSENGER TRANSPORT PROJECT. Maroc
- Abstracts: HZL SALES UP 27%, REPORTS RECORD PBT. EXCEL INDUSTRIES Q3 SALES UP 20% TO Rs80 CR
- Abstracts: CORE'S STRATEGY CADILA TAKES A NEW TURN IN MARKETING WITH DISHA 2000. HAL SET TO FLY ON NEW CO STRATEGY